Completed in 2007
The twin bridge is formed by two parallel trapezoidal slabs with lengths of 120.10 and 116.06 m. The decks of four spans, with lengths from 16.30 to 22.55 m, are supported in the bridge axis on intermediate supports and are fixed in torsion at the abutments.
SHP: design for construction permission
bid design
detailed design