Completed in 2007
The bridge crossing the river Morava, with a total length of 118 m, and the river bypass, have two spans with lengths of 54.5 and 29.0 m. The deck is formed by a slab of variable depth that is stiffened by edge girders. The deck, built from high strength concrete, is fixed into end diaphragms that are supported by drilled piles. The structure forms an integral system without bearings.
SHP: design for construction permission
bid design
detailed design