Completed in 2007
Renovation of the historic suspension bridge consisted of rewrapping the main suspension cables, replacing several suspenders and substituting a non-composite deck slab for a new one, which was designed as a composite without expansion joint.
Design: OBEC Consulting Engineers, Eugene, Oregon
Jiri Strasky: Conceptual design, detailed static and dynamic analysis.