Completed in 2002
The bridge is formed by a suspension structure with three spans of lengths of 36.5 + 131.0 + 36.5 m. The deck is assembled from precast segments with a depth of 0.45 m.
Design: OBEC Consulting Engineers, Eugene, Oregon
Jiri Strasky: Conceptual design, detailed static and dynamic analysis.