Completed in 2011
The self-anchored suspension bridge, with three spans of lengths 69.0 + 112.0 + 69.0 m, has a composite deck formed by four-cell box girders. The deck is a frame connected both to piers and low composite pylons.
SHP: first prize in a design competition
bid project – in collaboration with Tec 4, Barcelona.