Completed in 2019
The bridge of the total length of 1.3597 km long has 17 spans of length of 57.35 + 15 x 83.00 + 57.35 m. The bridge deck of the width of 19.70 m is assembled of precast, match cast segments of one cell box girder that will be erected by a launching girder in symmetrical cantilevers starting at piers.
SHP: alternative design
detailed design
(As a part of the RBAI JV – Rizzani
de Eccher, Italy & Besix, Belgium
& Acciona Infraestructuras, Spain, Joint
Venture)