Completed 2017
The twin bridge of the total length of 1.50 km is formed by a continuous structure of span lengths from 30.50 to 110.00 m. The central spans bridging the River Vah are formed by a box girder of a variable depth from 3.00 to 6.00 m that are segmentally cast in symmetrical cantilevers; the remaining spans have a double tee cross section of a constant depth of 3.00 m. These spans are cast span-by-span on stationary or movable scaffolding.
SHP: alternative design
detailed design