Completed in 2007
The twin bridge, with a total length of 306 m and spans from 54.0 to 100.3 m, has a deck formed by a box girder of variable depth that is assembled from steel sections and a concrete composite deck slab. On intermediate supports, the girder is supported in the bridge axis, and it is fixed in torsion at the abutments. The steel structure was erected in a progressive cantilever from one abutment to another.
SHP: design for construction permission
bid design
detailed design