Completed in 2007
The twin bridge, with five spans of lengths from 40,0 to 84.5 m, has a deck assembled from steel plate girders and a composite deck slab. A composite slab is also at the bottom flanges of the V shape piers supporting the main span. The steel structure was assembled beyond both abutments and subsequently launched into the design position.
SHP: conceptual design
managing the detailed design.