Completed in 2003
The twin bridge, with a total length of 402 m and spans from 49.7 to 102.6 m, has a deck formed by a box girder assembled from steel sections and a composite deck slab. On intermediate supports, the girder is supported by single supports in the bridge axis, and it is fixed in torsion at the abutments. The steel structure was erected in a progressive cantilever from one abutment to another.
SHP: design for construction permission
bid design
detailed design