Completed in 2003
The twin bridge, with a total length of 239.0 m and spans from 34.0 to 45.0 m, is formed by a spine girder of variable depth that was progressively cast – span by span – in a formwork supported by underslung movable scaffolding.
SHP: design for construction permission
bid design
detailed design