<< SHP Group
česky
english
по-русски

<< Back to Overpasses

Strutted frame across the freeway D1

Completed in 2003

The 67.4 m long bridge, with two spans of 41.3 + 16.7 m, is formed by a strutted frame. The deck is assembled from two plate girders and a concrete deck slab. Since the footing of the inclined strut is connected with the end diaphragm by a concrete strut, the structure forms a self-anchored system that stresses the footings by vertical reactions only.

SHP: design for construction permission
          bid design
          detailed design