<< SHP Group
česky
english
по-русски

<< Back to Overpasses

Bridge across the Highway I/11, Mokre Lazce

Completed in 2015

The bridge structure is formed by a frame structure assembled of a composite deck and concrete abutments supported by drilled piles. The deck is assembled of plate girders and composite concrete slab. The girders were erected with concrete flanges used as forms of the cast-in-place deck slab.

SHP: alternative design
          detailed design