Completed in 2009
The cable-bridge of one span of length of 50.50 m is suspended on an inclined pylon. The deck is formed by a partially prestressed slab.
Projekt: CH2M Hill, Calgary, Alberta
Jiri Strasky: Conceptual design, checking of the final design.
Strasky, Husty and Partners Ltd. (SHP), Bohunicka 133/50, 619 00 Brno, Czech Republic