Completed in 2014
The bridge of total length of 280 m is composed of a stayed bridge of two spans of lengths of 60 m and two approach viaducts. The deck of the cable-stayed bridge is formed by a cast-in-place girder of the trough cross section. Due to the significant plan curvature, the pylon has a V shape. The deck of the approach viaducts is assembled of precast beams and a composite concrete slab.
SHP: alternative design
final design