<< SHP Group
česky
english
по-русски

<< Back to Cable-stayed bridges

Bridge estaiada Guarujá, Brazil

Design

The bridge that bridging a motorway and parallel ramps is in a plan curvature of 161 m. The bridge length is 160 m, the span length of the main span is 80 m. The prestressed concrete deck is formed by edge girders that are mutually connected by floor beams and a deck slab.

SHP: alternative design
          detailed design