Completed in 2007
The twin bridge, with a total length of 605.0 m, has 14 spans with lengths from 21.5 to 105.0 m. Each bridge is formed by a two-cell box girder. In the main and two adjacent spans the girders are mutually connected by top slab and individual struts, and suspended on a single pylon situated in the bridge axis.
SHP: design for construction permission
bid design
detailed design