Completed in 1987
The cable-stayed bridge, with three spans having lengths of 61.6 + 123.2 + 61.6 m, is formed by a box girder with a width of 31.80 m, which is assembled from precast segments and additionally cast overhangs supported by precast struts. The girder is suspended on two single pylons situated in the bridge axis.
Design: Design office of Dopravni stavby Olomouc.
Jiri Strasky: Author of design, chief design engineer.
Ilja Husty: Project engineer.