Bridge across railway in Bohumin

Comleted in 2011

The is a bridge with a total length of 140.3 m, and has three spans with lengths of 30 + 70 + 30 m. The deck, which is formed by a two-edge girder mutually connected by floor beams and a composite deck slab, is suspended on two pylons.

SHP: design for construction permission
          bid design