Completed in 2007
The tunnel bridge, with a total length of 79 m, is formed by two flat arches with a span length of 25 m. The horizontal force of the arches is resisted by prestressed ties (stress ribbons) situated above the arches.
SHP: design for construction permission
bid design
detailed design