Completed in 2008
The 23.8 m long buried bridge is formed by a two-span arch structure with a length of 10.8 m that are assembled of precast members.
SHP: detailed design
Strasky, Husty and Partners Ltd. (SHP), Bohunicka 133/50, 619 00 Brno, Czech Republic