Completed 2017
The bridge of the total length of 420 m is formed by a continuous structure of six spans of a span length from 45 to 87 m. The deck is formed by two plate girders of depth of 4.40 m that are composite with a cast-in-place concrete slab. The steel girders are incrementally launched; the deck slab is incrementally cast in a formwork suspended on movable scaffolding. Only one half of the motorway is constructed now.
SHP: alternative design