Completed 2017
The bridge of the total length of 591 m is formed by a continuous structure of nine spans of a span length from 30 to 92 m. The deck is formed by a box girder of a variable depth from 2.70 to 5.00 m that is segmentally cast in symmetrical cantilevers starting at piers. Only one half of the motorway is constructed now.
SHP: alternative design
detailed design