<< SHP Group
česky
english
по-русски

<< Back to Bridges across deep valleys

Bridge across the Rybny Creek, Motorway D8

Completed in 2006

The bridge, with a total length of 356.0 m and spans from 34.0 to 58.0 m, has a 31.0 m wide deck formed by a spine box girder with large overhangs supported by precast struts. The bridge deck was incrementally cast and subsequently launched into the design position.

SHP: alternative design
          detailed design