Completed in 2015
The bridge of the total length of 528.0 m forms a continuous girder of 11 spans of lengths from 33.0 to 57.0 m. The deck is formed by a composite box girder with large overhangs supported by pipe struts. The deck slab is assembled of precast members that are composite with cast-in-place concrete. The bridge was incrementally launched.
SHP: alternative design
detailed design