Completed in 2013
The freeway bridge of the total length of 625 m crosses the Willamette River by two arches of span length of 119 and 127 m. The twin arch bridge is formed by two arch ribs that support the double tee deck.
Design: OBEC Consulting Engineers, Eugene, Oregon
Jiri Strasky: Lead Bridge Engineer
Conceptual Design
Static and dynamic analysis