Completed in 1994
The bridge is formed by a continuous arch structure of eight spans with lengths of 48.16 m. The arches are assembled from concrete arch segments of a channel section and a cast-in-place fill; the deck is formed by precast girders and a composite deck slab.
Design: CH2M HILL, Milwaukee, Wisconsin.
Jiri Strasky: Conceptual design, checking the final design.