Completed in 2007
The bridge is formed by a continuous arch structure of three spans with lengths of 61.40 m. The arches and the deck are formed by two girders designed without diaphragms.
Design: OBEC Consulting Engineers, Eugene, Oregon.
Jiri Strasky: Conceptual design, detailed static and dynamic analysis.